Year | Client | Project Client | Project Description |
---|---|---|---|
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2024/01 |
Pipe Cleansing and Condition Surveys On Drains and Sewers with High Water Level / High Flow and Blockage Problem, and Manhole Inspections in Mong Kok Area | |||
2023 | Drainage Services Department | Drainage Services Department | Contract No. MS/2023/06 |
Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Lai Chi Kok, Cheung Sha Wan, Sham Shui Po, Shek Kip Mei, Tai Kok Tsui, Mong Kok and Yau | |||
2023 | Drainage Services Department | Drainage Services Department | Contract No. MS/2023/01 |
Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon Bay, Ngau Tau Kok and Kwun Tong | |||
2023 | Drainage Services Department | Drainage Services Department | Contract No. MS/2023/04 |
Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Ma On Shan, Sha Tin, Tsuen Wan and Kwai Tsing | |||
2023 | Drainage Services Department | Drainage Services Department | Contract No. MS/2023/02 |
Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon City and Tsim Sha Tsui | |||
2022-2023 | Drainage Services Department | Binnies Hong Kong Limited | Contract No. PR/2021/03, PR/2021/04, PR/2021/05, PR/2021/06, PR/2021/07, PR/2021/08, PR/2021/09, PR/2021/10, PR/2021/11, |
and PR/2021/12 | |||
Engineering Inspection for Underground Stormwater Drains and Sewers in (North District and Yuen Long (North), Yuen Long (South), Tuen Mun and Tsuen Wan (West), Tsuen Wan (East) and Kwai Tsing, Sham Shui Po, Kwun Tong (East), Kwun Tong (West), Kowloon City (East), Yau Tsim Mong (South), and Kowloon City (West) and Yau Tsim Mong (North) | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/18 |
Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Kowloon West | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/35 |
Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Kowloon West | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/33 |
Pipe Cleansing and Condition Surveys on Drains and Sewers in Kolwoon Central | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. MN/2021/08 |
Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Tai Po East | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. MN/2021/09 |
Pipe Cleaning and Condition Surveys on Drains and Sewers in North District West | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/43 |
Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Tsuen Wan and Kwai Tsing | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/18, PR/20201/33, and PR/2021/35 - Pipe Cleansing and Condition Surveys On Drains and Sewers In Kowloon East, Kowloon Central, and Kowloon West |
2021 | Drainage Services Department | Drainage Services Department | Contract No. MN/2021/08, and MN/2021/09 |
Pipe Cleansing and Condition Surveys on Drains and Sewers and Manhole Inspections in Tai Po East, and North District West | |||
2020 | Drainage Services Department | Binnies HK Limited | Contract No. PM07/2020, PM08/2020, PM 09/2020, PM 10/2020, PM 11/2020, PM 12/2020, and PM 13/2020 |
- Engineering Inspection for Underground Stormwater Drain and Sewers in Shatin (South), Shatin (North), Eastern Southern and Islands, Central & Western and Wan Chai, Tai Po (Southwest), Tai Po (Northwest), and Tai Po (East) and Sai Kung | |||
2020 | Drainage Services Department | Drainage Services Department | Contract No. MS/2020/21, MS/2020/22, MS/2020/23, MS/2020/24, and MS/2020/25 - |
Pipe Cleansing and Condition Surveys on Drains and Sewers in Ma On Shan, Tsuen Wan East and Kwai Tsing East, Tsuen Wan West and Kwai Tsing West, Sham Shui Po and Yau Ma Tei, and Mong Kok | |||
2019 | Architectural Services Department | Architectural Services Department | CCTV Survey for Government Properties for which ASD (PSB) is responsible in Tuen Mun and Yuen Long |
2018 | Architectural Services Department | Architectural Services Department | Close Circuit Television Surveys for Government Properties for which ArchSD(PSB) is Responsible in Wong Tai Sin & Shatin |
2018 | Drainage Services Department | Black & Veatch Hong Kong Limited | Contract No. DPW 03/2018 |
Condition Survey for Drainage Improvement Works in Mong Kok | |||
2018 | Drainage Services Department | Black & Veatch Hong Kong Limited | Contract No. PM 02/2018 |
Condition Survey for Decked Nullahs | |||
2018 | The Chinese University of Hong Kong | The Chinese University of Hong Kong | CCTV Inspection for sewer drainage system at Fong Yun Wah Hall, The Chinese University of Hong Kong |
2017 | Architectural Services Department | Architectural Services Department | CCTV Survey to Government Properties for which the Architectural Services Department (Property Services Branch) is Responsible in Responsible in Western, Southern & Lantau |
2016 | Architectural Services Department | Architectural Services Department | Contract No.: CC-002 |
Closed Circuit Television Surveys (CCTV) for Government Properties for which ArchSD(PSB) is responsible in Wanchai | |||
2016 | Architectural Services Department | Architectural Services Department | CCTV survey to underground drainage system at Venue 23,10,21,24,25,29,33,11&27 (Kwai Chung) |
2016 | Architectural Services Department | Architectural Services Department | CCTV survey to underground drainage system at Venue 1, 2, 3, 12, 13, 31&32 (Tsuen Wan) |
2016 | The Hong Kong & China Gas Co., Ltd | The Hong Kong & China Gas Co., Ltd | Man Entry Survey for the Box Culvert in the Territories |
2016 | The Chinese University of Hong Kong | The Chinese University of Hong Kong | Provision of CCTV inspection services for part of sewer drainage in Wen Lin Tang, The Chinese University of Hong Kong |
2015 | TIML MOM Limited | TIML MOM Limited | TD6/2012 - Agreement for MOM of Tsing Ma Control Area (TMCA) |
Closed Circuit Television Survey Inspection of At-Grade Road Drains (including Leakage Detection of Buried Water-Carrying Services Affecting Slopes) within Tsing Ma Control Area - 2015 | |||
2011 | Architectural Services Department | Savills Project Consultancy Limited | Aged Government Building at Various Location |
CCTV Survey for Underground Drainage | |||
2011 | Architectural Services Department | Freevision Limited | Consultancy Assignment for Independent Audit Check of Condition Surveys for Building Aged 30 or Above |
CCTV for Central, Peak, Mid-Level & Wanchai | |||
2008 | Kadoorie Estates Ltd. | Kadoorie Estates Ltd. | CCTV Survey and Remedial Works by competent persons |
St. George's Building | |||
Connaught Road Central, Hong Kong | |||
2008 | Drainage Services Department | Drainage Services Department | CE 4/2007(DS) |
Sewage Interception Scheme in Kowloon City - Investigation | |||
Contract No. SP03/2008 - Manhole and CCTV survey | |||
2007 | Hong Kong and China Gas Company Limited | Hong Kong and China Gas Company Limited | Men-Entry Survey of Box Culvert for existing gas pipe |
Our Major Projects
Year | Client | Project Client | Project Description |
---|---|---|---|
2023 | Drainage Services Department | Drainage Services Department | Drainage Services Department Contract No. MS/2023/06 - Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Lai Chi Kok, Cheung Sha Wan, Sham Shui Po, Shek Kip Mei, Tai Kok Tsui, Mong Kok and Yau Ma Tei |
2023 | Drainage Services Department | Drainage Services Department | Contract No. MS/2023/01 - Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon Bay, Ngau Tau Kok and Kwun Tong |
2021 | Hongkong International Terminals Limited | Hongkong International Terminals Limited | Manhole Survey and CCTV inspection for the sewage pipe at Terminal 4 |
2017 | Environmental Protection Department | Environmental Protection Department | Provision of Service for Expedient Connection and Stormwater Manhole Pollution |
Survey in Mong Kok and Tai Kok Tsui Area | |||
2016 | Environmental Protection Department | Fuk Shing Construction Co., Ltd. | EPD Contract No. EP/SP/90/16 - Condition Survey on Infrastructure to Combat Stormwater Pollution |
2016 | Hongkong International Terminals Limited | Hongkong International Terminals Limited | RFQ-2016-41681 Manhole Survey and Utility Survey for New RMGC Cable Ducting Works |
2014 | Environmental Protection Department | Environmental Protection Department | Provision of Services for The Identification of ECs in the Catchment Areas of Tsim Sha Tsui East, Kin Wan Street and Hoi Sham Park Box Culverts |
2014 | Environmental Protection Department | Environmental Protection Department | Quotation Ref. 14-00232 |
Provision of Services for the Identification of Expedient Connection in Kwun Tong | |||
2013 | Drainage Services Department | Drainage Services Department | Contract No. 12/LD/2013 |
Manhole Survey in Tai Po | |||
2013 | Drainage Services Department | Drainage Services Department | Contract No. 09/LD/2013 |
Manhole Survey in Sha Tin and Sai Kung | |||
2012 | Drainage Services Department | Drainage Services Department | Contract No. 06/LD/2012 |
Manhole Survey in East Kowloon | |||
2012 | Drainage Services Department | Drainage Services Department | Contract No. 05/LD/2012 |
Manhole Survey in West Kowloon | |||
2011 | Environmental Protection Department | Environmental Protection Department | Tender Ref. RW 10-166 |
Tender for the Provision of Service for the Identification of Expedient Connection in Shamshuipo 2011 | |||
2009 | Environmental Protection Department | Environmental Protection Department | Tender Ref. RW 08-0243 |
Provision of Services for Identification of Expedient Connections (2009/2010) | |||
Carry out manhole survey for stormwater drainage system at Tuen Mun | |||
2008 | Drainage Services Department | Drainage Services Department | CE 4/2007(DS) |
Sewage Interception Scheme in Kowloon City - Investigation | |||
Contract No. SP03/2008 - Manhole and CCTV survey | |||
2007 | Environmental Protection Department | Environmental Protection Department | CE37/2006(DS) |
Tender Ref. SI 07-016 | |||
Provision of Service for DWFI Inspection Survey | |||
2007 | Environmental Protection Department | Environmental Protection Department | Review of West Kowloon and Tsuen Wan Sewerage Master Plans-Feasibility Study |
Tender for the Provision of Service for Investigation Surveys for | |||
Critical Problematic Areas in West Kowloon and Tsuen Wan | |||
2007 | Environmental Protection Department, HKSAR | Environmental Protection Department, HKSAR | Provision of Service for the Kowloon City District Expedient Connection Survey |
65Year | Client | Project Client | Project Description |
---|---|---|---|
2022-2023 | Drainage Services Department | Binnies HK Limited | Contract No. DPW 04/2022 Excavation of Inspection Pits and Underground Utility Survey for Minor Drainage Improvement Works in Tai Hang and Sheung Wan |
2022-2023 | Drainage Services Department | Binnies HK Limited | Contract No. DPW 01/2022 Excavation of Inspection Pits and Underground Utility Survey for Minor Drainage Improvement Works in Repulse Bay, Stanley and Sha Tin |
2022 | Drainage Services Department | Binnies HK Limited | Contract No. DP 26/2021 Provision of Services of Utility Survey in North District |
2021 | Drainage Services Department | Drainage Services Department | Contract No. SD 08/2021 Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works and Other Works - Utility Survey (San Shek Wan to Tong Fuk) |
2021 | Drainage Services Department | Binnies HK Limited | Contract No. SM 06/2021 Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Causeway Bay |
2021 | Drainage Services Department | Binnies HK Limited | Contract No. SM 05/2021 Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Hung Hom |
2020 | Drainage Services Department | Drainage Services Department | Contract No. CM03/2020 Topographical and Utility Survey for North East New Territories Sewerage System Upgrade |
2020 | Drainage Services Department | Drainage Services Department | Contract No. DP07/2020 Non-destructive Utilities Survey for Drainage Improvement Works in Sai Kung and North District |
2020 | Drainage Services Department | Drainage Services Department | Contract No. DP06/2020 - Non-destructive Utilities Survey for Drainage Improvement Works in Sha Tin |
2018 | AECOM Asia Co., Limited | AECOM Asia Co., Limited | Underground Utility Survey at Site Area near East Coast Road and Sky City Interchange |
2017 | China State Construction Engineering (HK) Ltd. | China State Construction Engineering (HK) Ltd. | Contract 3801 APM and BHS Tunnels on Existing Airport Island |
Underground Utility Survey | |||
2016 | Gammon Construction Limited | Gammon Construction Limited | Underground Utility Survey at Black Point Power Station |
2016 | Meinhardt (Hong Kong) Ltd. | Meinhardt (Hong Kong) Ltd. | Hong Kong International Airport Contract P271 – Terminal 1 Capacity Enhancement Design Consultancy Services |
Underground Utility Survey | |||
2015 | Hong Kong International Airport | AECOM | P252 Utility Survey at Airport Road and Sky City Road |
2014 | Hong Kong International Airport | Gammon Construction Limited | Hong Kong International Airport |
Contract P557 – Midfield Phase 2 Development Site Investigation Works | |||
2014 | Highways Department | CRBC-Kaden Joint Venture | Contract No. HY/2013/12 |
Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works | |||
Sub-Contractor Package: UU Detection | |||
2014 | CLP Power HK Ltd. | Gammon Construction Limited | Utility Survey for SI Works for Existing / Prospective Sites of CLP Power's Premises (2014-2016) for CLP Power HK Ltd. |
2014 | Drainage Services Department | Chun Wo Construction & Engineering Co., Ltd | Contract No. DC/2012/03 Happy Valley Underground Stormwater Storage Scheme |
Underground Utilities Detection | |||
2013 | Gammon Construction Limited | Gammon Construction Limited | Happy Valley Racecourse |
Utility Survey | |||
2013 | Penta-Ocean Construction Co., Ltd. | MTRC | Shatin to Central Link Contract 1102 – Hin Keng Station and Approach Structures |
Underground Utilities Detection | |||
2012 | MTR Corporation Limited | Vinci Construction Grands Projets | MTRC Hin Keng to Diamond Hill Tunnels (SCL 1103) |
Underground Utility Survey | |||
2012 | Highway Department | Dragages-China Harbour-VSL Joint Venture (DCVJV) | Contract No. HY/2011/09 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road | |||
Section Between HKSAR Boundary and Scenic Hill | |||
Underground Utility Survey | |||
2011 | MTR Corporation Limited | Chun Wo - Hip Hing Joint Venture | MTRC - Kwun Tong Line Extension |
Contract 1002 Whampoa Station and Overrun Tunnel | |||
Non-destructive Utilities Survey | |||
2010 | Water Supplies Department | AECOM | Agreement No. CE 58/2008 (WS) |
Integration of Ma On Shan and Pak Kong Fresh Water Supply Systems | |||
Investigation, Design and Construction | |||
Utility Survey in Sai Kung and Ma On Shan Areas | |||
2010 | Civil Engineering & Development Department | Chun Wo - Leader Joint Venture | Contract No. HK/2009/01 |
Wan Chai Development Phase II | |||
Central - Wan Chai Bypass at HKC and Exhibition Centre | |||
Detection of Existing Utilities | |||
2009 | Drainage Services Department | Metcalf & Eddy Ltd. | Agreement No. CE 43/2007 (DS) |
Upgrading of San Wai Sewage Treatment Works | |||
-Investigation, Design and Construction | |||
Utility Survey for San Wai Sewage Treatment Works Area | |||
2009 | Hong Kong Housing Authority | Dixie Engineering Co. Ltd. | Contract No. 20090061 |
Underground utilities investigation term contract (2009-2011) | |||
2009 | Water Supplies Department | Water Supplies Department, HKSAR | Agreement No. CE10/2008(WS) |
Replacement and Rehabilitation of Water Mains Stage 4 | |||
Mains in New Territories | |||
Utilities Survey in Tuen Mun, Yuen Long and Kam Tin | |||
2009 | Water Supplies Department | Water Supplies Department | Agreement No. CE10/2008/(WS) |
Replacement and Rehabilitation of Water Mains Stage 4 | |||
Mains in New Territories | |||
Utilities Survey in Tsing Yi and Kwai Chung | |||
2009 | Water Supplies Department | Water Supplies Department | Agreement No. CE10/2008/(WS) |
Replacement and Rehabilitation of Water Mains Stage 4 | |||
Mains in New Territories | |||
Utilities Survey in Tsuen Wan, Siu Lam, Sham Tseng and Ma Wan | |||
2008 | MTR Corporation Limited | US & Associates Consultants Co., Ltd. | Utility survey at MTRC Hung Hom Station |
2008 | Water Supplies Department | Noble Crown Development Ltd. | Contract No. 16/WSD/06 |
Replacement and Rehabilitation of Water Mains Stage 2 | |||
Mains in West Kowloon and Kowloon City | |||
Underground Utilities Mapping and Survey | |||
2008 | Highways Department | Highways Department | Reconstruction and Improvement of Tuen Mun Road -Design and Construction |
Supplementary Agreement No. 1 | |||
Traffic Improvements to Tuen Mun Road Town Centre Section - | |||
Utility Investigation | |||
2006 | Water Supplies Department | Water Supplies Department | CE3/2005(WS) |
Replacement and Rehabilitation of Water Mains Stage 2 | |||
Mains on Hong Kong and Islands | |||
Investigation, Design and Construction | |||
Utility Survey at Hong Kong East | |||
2006 | Water Supplies Department | Water Supplies Department | CE3/2005(WS) |
Replacement and Rehabilitation of Water Mains Stage 2 | |||
Mains on Hong Kong and Islands | |||
Investigation, Design and Construction | |||
Utility Survey at Hong Kong Central, Wan Chai & Lantau |
Year | Client | Project Client | Project Description |
---|---|---|---|
2022-2023 | Water Supplies Department | Water Supplies Department | Contract No. 17/WSD/21 - Leak Detection for Water Main in New Territories West |
2022-2023 | Water Supplies Department | Water Supplies Department | Contract No. 16/WSD/21 - Leak Detection for Water Main in Hong Kong and Outlying Islands |
2022 | The Chinese University of Hong Kong | The Chinese University of Hong Kong | Inspection of Buried Water Carrying Services affecting slopes along Residence Road, The Chinese University of Hong Kong |
2019 | Hospital Authority | Hospital Authority | Water Leak Detection at Ruttonjee Hospital |
2018 | Electrical and Mechanical Service Department | Electrical and Mechanical Service Department | Water Leakage Survey of Street Fire Hydrant Underground Pipes and Associated accessories at Castle Peak Hospital |
2017 | Water Supplies Department | Water Supplies Department | Contract No. 20/WSD/16 - Leak Detection for Water Mains in New Territories West |
2016 | Water Supplies Department | Water Supplies Department | Contract No. 5/WSD/16 |
Leak Detection for Water Mains in Hong Kong and Outlying Island | |||
2014 | Water Supplies Department | Water Supplies Department | Contract No. 12/WSD/14 |
Leak Detection for Water Mains in Sai Kung | |||
2011 | Water Supplies Department | Wo Hing Construction Co., Ltd | Contract No. 1/WSD/11(K) |
Water Leak Detection for Maintenance Contract of Water Supplies Department | |||
2010 | MTR Corporation Limited | MTR Corporation Limited | Emergency Water Leakage Detection of MTRC Underground Condensing Mains |
2008 | Water Supplies Department | Wo Hing Construction Co. Ltd. | Contract No. 1/WSD/08 (K) |
Water Leak Detection for Maintenance Contract of Water Supplies Department, HKSAR | |||
2008 | Architectural Services Department, HKSAR | Architectural Services Department, HKSAR | Quotation Ref. No.: O&ML 09-19 |
Carry out buried water-carrying services leakage testing | |||
at Hong Kong Zoological & Botanical Gardens | |||
2008 | MTR Corporation Limited | Maeda Corporation | MTRC-617 Tseung Kwan O South Station |
Hydrogen Gas Leak Detection for Salt Water Main | |||
2006 | Water Supplies Department, HKSAR | Wo Hing Construction Co., Ltd | Contract No. 1/WSD/06(W) |
Water Leak Detection for Maintenance Contract of Water Supplies Department, HKSAR |
Year | Client | Project Client | Project Description |
---|---|---|---|
2022 | The Chinese University of Hong Kong | The Chinese University of Hong Kong | Inspection of Buried Water Carrying Services affecting slopes along Residence Road, The Chinese University of Hong Kong |
2016 | Savills Property Management Ltd. | Tom Leung Consulting Engineers | Leakage Investigation Fieldworks for Water Carrying Servcies at No. 5G-5H & 5J-5K Bowen Road, Hong Kong in the Vicinity of Feature No. 11SW-B/CR 618 |
2013 | The Chinese University of Hong Kong | The Chinese University of Hong Kong | Investigation Works on Buried Water Carrying Services in Vicinity of |
Various Slope Features within the University's Campus | |||
2009 | The Hong Kong Bayanihan Trust | US & Associates Consulting Co. Ltd. | Consultancy Services Proposal for Discharging of BDDH20/02/HK (BS) at #55, Victoria Road, Hong Kong |
2008 | The Incorporated Owners of Wah Kwai Estate | Maunsell Geotechnical Services Ltd. | Leakage detection works for slopes Nos. 11SW-C/C358, 11SW-C/C359, 11SW-C/C360, 11SW-C/F28(2), 11SW-C/FR282, 11SW-C/FR94 & 11SW-C/FR95 at No. 3 Wah Kwai Rd., Wah Kwai Estate, Aberdeen, Hong Kong |
2008 | Architectural Services Department, HKSAR | Architectural Services Department, HKSAR | Quotation Contract No.: 33/KWT(W)/2008 |
Inspection and testing of buried water-carrying services with 2 set reports at Wo Yi Hop Road Sports Ground, Tang Shiu Kin Sports Centre and North Kwai Chung Jockey Club Swimming Pool | |||
2008 | Architectural Services Department, HKSAR | Architectural Services Department, HKSAR | Carry out BWCS works to lot no. HKM-19 |
Ex-Pathological Institute (Medical Museum), 2 Caine Lane | |||
2003 | The Chinese University of Hong Kong | Univic Engineering Ltd | Investigation & Repair Works on Buried Water Carrying Services at Features Nos. 7NE-C/C65, C66, C127, C132, C150, C156, C166, C179, C232, C266, C270, C276, C281, C307, C396, CR135, F16, F18, F129, FR84 & R7 for the Chinese University of HK |
2003 | Hong Kong Housing Authority, HKSAR | Yick Hing Construction Co Ltd | HKHA CONTRACTNO 20010038 TERM CONTRACT FOR SLOPE MAINTENANCE AND IMPROVEMENT WORKS AT NORTHERN REGION(FOLLOW UP UTEC DATA) |
Year | Client | Project Client | Project Description |
---|---|---|---|
2024 | Drainage Services Department | Drainage Services Department | Contract No. MS/2024/05 Rehabilitation and Replacement of Sewers at Kin Chuen Street and Wo Tong Tsui Street near Tai Wo Hau Road, Kwai Chung |
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2023/15 Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 2) |
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2023/16 Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 3) |
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2023/17 Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 4) |
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2023/18 Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 5) |
2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2024/03 Sewer/Stormwater Drain Rehabilitation in Yau Kom Tau |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2023/02 Trunk Stormwater Drain Rehabilitation at Wan Wah Street near Wai Wah Street, Wong Tai Sin |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. HKI/2023/03 Rehabilitation and Replacement of Sewer and Stormwater Drain at Hong Kong Island (Eastern) (Package 2) |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. HKI/2022/09 Rehabilitation and Replacement of Sewer and Stormwater Drain at Hong Kong Island (Eastern) (Package 1) |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2022/21 Invitation for Quotation Sewer Rehabilitation near Chai Wan Kok Street, Sha Tsui Road, Tai Pa Street in Tsuen Wan and Wo Kwai Lane in Kwai Chung |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. PR/2022/24 Trunk Sewer / Stormwater Drain Rehabilitation in Sham Shui Po |
2023-2024 | Drainage Services Department | Drainage Services Department | Contract No. MN/2022/09 Pipe Rehabilitation in Yuen Long |
2022-2023 | Drainage Services Department | Drainage Services Department | Contract No. MN/2022/05 Pipe Rehabilitation in Tuen Mun |
2022 | Drainage Services Department | Drainage Services Department | Contract No. HKI/2021/08 Rehabilitation of Sewer and Stormwater Drain in Central |
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/31 |
Sewer/Stormwater Drain Rehabilitation in Tseung Kwan O | |||
2022 | Drainage Services Department | Drainage Services Department | Contract No. PR/2021/02 Sewer/Stormwater Drain Rehabilitation near Lok Shan Road |
2021 | Drainage Services Department | Drainage Services Department | Contract No. MS/2020/19 Sewer/Stormwater Drain Rehabilitation in Sheung Kwai Chung |
2019 | Drainage Services Department | Drainage Services Department | Contract No. PM08/2018 Sewer Rehabilitation at Salisbury Road adjacent to Nathan Road and Middle Road, Tsim Sha Tsui |
2018 | New World Construction Company Limited | New World Construction Company Limited | High Pressure Water Jetting & Relining of 225 mm diameter pipe at Sai Yuen Lane, Sai Ying Pun |
2018 | Leighton-Gammon Joint Venture (810A) | Leighton-Gammon Joint Venture (811A) | Lining at 810A West Kowloon Terminus Station North |
2017 | New World Construction Co. Ltd. | New World Construction Co. Ltd. | Lining Work of Existing 1200mm dia. Sewer Pipe at Salisbury Road (for KS61 Project) |
2017 | I.O. of Fu Keung Court | Shui On Properties Management Limited | Underground Drainage System Repair Work at Blocks B & C of Fu Keung Court |
2016 | New World Construction Co. Ltd. | Kaden Construction Limited | 12106 New World Centre Remodeling |
Nominated Subcontract (Package Code no. 4040) Sea Deck A&A Works | |||
Subcontract No. 1309/6010 - Pipeline Rehabilitation | |||
2016 | The Incorporated Owners of Green Villa | The Incorporated Owners of Green Villa | Lining works at Green Villa |
2013 | Architectural Services Department | Architectural Services Department | Quotation No.: P&ML-13-107 |
Internal Lining for Underground Drainage Repair at Fairmont Gardens | |||
2011 | Penta-Ocean Construction Co., Ltd. | Penta-Ocean Construction Co., Ltd. | Relining Works to Drainage Pipe |
at Choi Ming Street and King Ling Road, Tsuen Kwan O | |||
2011 | Hongkong Land Ltd. | Davis Langdon & Seah Hong Kong Ltd. | Hongkong Land Sewerage Review 2008 |
Tender for Pipeline Rehabilitation Works (Phase II) | |||
2010 | The Hong Kong and China Gas Co. Ltd. | The Hong Kong and China Gas Co. Ltd. | Quotation Ref. No.: ND/NP/MIS/K/Q005/10 |
Pipe Cutting, Sealing and Removing of Existing 300mm Gas Main (with sleeve or without sleeve) inside Box Culvert at | |||
Tokin Street J/O Fuk Wing Street I/C with DSD Project PWP Item 4138CD - Decking of Tonkin Street | |||
2009 | Hongkong Land Ltd. | Hongkong Land Ltd. | Hongkong Land Seawater Review 2008 |
Pipeline Rehabilitation Works | |||
Ice House Street, Des Voeux Road | |||
2008 | The Plantation Road JV committee | Kam Ming Design Limited | New Sewer/Drainage works at 15-27 Plantation Road, The Peak |
2008 | Kadoorie Estates Ltd. | Kadoorie Estates Ltd. | CCTV Survey and Remedial Works by competent persons |
St. George's Building | |||
Connaught Road Central, Hong Kong | |||
2008 | Civil Engineering and Development Department, HKSAR | Leighton-China State-Van Oord Joint Venture | H2189-Central Reclamation |
Joint Repair at the Central Reclamation III Site for two DN900mm Sea Water Cooling Mains by AMEX-10 Seal | |||
2006 | The Hongkong and Shanghai Banking Corporation (HSBC) | Johnson Controls Hong Kong Ltd. | HSBC Main Building - BRW16-05 Seawater Main Pipe Inspection and Repair at HMB |
Year | Client | Project Client | Project Description |
---|---|---|---|
2023 | World Genius Corporation Limited | World Genius Corporation Limited | Void Detection (GPR Survey) and Grouting Work at Sun Hung Kai Centre, Tonrochy Road, Wan Chai |
2021 | The Lab (Asia) Ltd | The Lab (Asia) Ltd | Void Detection by GPR Survey at Hong Kong International Airport Taxiway |
2020 | Wo Hing Construction Co., Ltd | Wo Hing Construction Co., Ltd | Locating the alignment of 2xDN1000 and 1xDN500 Coolling Main at Kai Tak Area by Ground Penetrating Radar (GPR) Survey |
2018 | Chun Wo Construction & Engineering Co Ltd | Chun Wo Construction & Engineering Co Ltd | Tolo Highway Highway, southbound near Shatin Racecourse Road |
Ground Penetrating Radar (GPR) Survey | |||
2018 | New City Construction Co., Ltd. | New City Construction Co., Ltd. | Utility and GPR Survey at Tsun Yip Street, Kwun Tong |
2016 | MTR Corporation Limited | Chun Wo Construction & Engineering Co., Ltd. | Void Detection of the soil underneath the tracks at Tung Chung Line by Ground Penetrating Radar (GPR) |
2014 | Great East Asia Surveyors & Consultants Co. Ltd. | Great East Asia Surveyors & Consultants Co. Ltd. | Four survey locations at Shell Tsing Yi Installation, Sai Tso Wan Road, Tsing Yi, N.T. |
Ground Penetrating Radar (GPR) Survey | |||
2014 | Leader - Sunnic Joint Venture | Leader - Sunnic Joint Venture | Pavement Area near Klnwcity Community Hall |
Choi Hung Road, Wong Tai Sin | |||
GPR Survey | |||
2013 | Samsung - Hsin Chong Joint Venture | Samsung - Hsin Chong Joint Venture | SCL 1109: Structural Diagnostic on Nullah Rock Wall |
2010 | Drainage Services Department, HKSAR | China Road and Bridge Corporation | Contract No.: DC/2009/07 |
North District and Tolo Harbour Regional Sewerage – Upgrading of Trunk Sewers at Ma Liu Shui, Tai Po and North District | |||
2009 | Harbour City Estates Limited | Harbour City Estates Limited | Ocean Terminal, Tsim Sha Tsui, Kowloon |
2009 | Drainage Services Department, HKSAR | Penta-Ocean Construction Co. Ltd. | Contract No. DC/2002/02 |
Wan Chai East and North Point Sewerage Remaining Works | |||
GPR Survey at Tin Hau Temple Road | |||
2009 | Hong Kong Customs and Excise Dept. | Hong Kong Customs and Excise Dept. | GPR survey for void detection |
at Stonecutters Island Public Cargo Working Area | |||
2009 | CM Wong & Associates Ltd. | CM Wong & Associates Ltd. | Structural survey for the Stone Houses at Hau Wong Temple New Village and Old House Wong UK Village, Shatin |
2009 | Penta Ocean Construction Co., Ltd | Black & Veatch Hong Kong Limited | Emergency Works for Void Detection by Ground Penetrating Radar (GPR) Survey At Tai Hang Road, Hong Kong |
2008 | ExxonMobil Hong Kong Ltd. | ExxonMobil Hong Kong Ltd. | WS UG Fireline GPR (Ground Penetrating Radar) |
at Tsing Ti West Site, Tsing Keung No. 19 | |||
2008 | Sanfield Building Contractors Ltd. | Sanfield Building Contractors Ltd. | Void Detection by Ground Penetrating Radar Survey (GPR) |
at Hoi Fai Road, Kowloon | |||
2007 | Highways Department, HKSAR | Hip Hing Construction Co., Ltd | GPR Survey at Ma Tin Road, Yuen Long |
Year | Client | Project Client | Project Description |
---|---|---|---|
2021 | Hing & Cheong Co. Ltd. | Hing & Cheong Co. Ltd. | Flow Survey for Manholes at Contract DC/2020/08 |
2018 | WSP Group | WSP Group | Water Flow Rate Measurement at Diamond Hill CDA Site |
2016 | Drainage Services Department | Drainage Services Department | Contract No. HKI 01/2016 |
Installation of Flow Monitoring System of Hong Kong West Drainage Tunnel, Lai Chi Kok Drainage Tunnel and Tsuen Wan Drainage Tunnel | |||
2016 | Drainage Services Department | Drainage Services Department | Contract No. 05/LD/2016 |
Flow Survey in Tsuen Wan Drainage Tunnel | |||
2016 | Drainage Services Department | Drainage Services Department | Contract No. 06/LD/2016 |
Flow Survey of Hong Kong West Drainage Tunnel | |||
2015 | Drainage Services Department | Drainage Services Department | Contract No. 03/LD/2015 |
Installation of New Gauging Stations at Yuen Long | |||
2015 | Drainage Services Department | Drainage Services Department | Contract No. 04/LD/2015 |
Flow Survey of Hong Kong West Drainage Tunnel | |||
2013 | Drainage Services Department | Drainage Services Department | Contract No. 14/LD/2013 |
Flow Survey in Hong Kong West Drainage Tunnel | |||
2013 | Drainage Services Department | Drainage Services Department | Contract No. PM 2/2013 |
Flow Monitoring, CCTV and Manhole Surveys for Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung | |||
2013 | Drainage Services Department | Drainage Services Department | Contract No. 06/LD/2013 |
River Flood Risk Study - Stage 1 | |||
River Monitoring and Flood Warning System at | |||
Chuen Lung, Tsuen Wan and Ta Shek Wu, Pat Heung | |||
2012 | Drainage Services Department | Drainage Services Department | Contract No. SPW 04/2013 |
CCTV, Manhole, Utility and Flow Surveys, | |||
and Water Sampling and Testing for Yuen Long Town Nullah | |||
(Town Centre Section) - Stage 1 Improvement Works | |||
2012 | Drainage Services Department | Drainage Services Department | Contract No. 11/LD/2012 |
Flow Survey in Hong Kong West Drainage Tunnel | |||
2012 | Drainage Services Department | Drainage Services Department | Quotation Ref: MS/2012/04 |
Extended Monitoring Scheme of Flow Levels in Drainage and Sewerage Systems | |||
2012 | Civil Engineering and Development Department | Civil Engineering and Development Department | Contract No. KLN/2012/09 |
Pollution Loading Inventory Survey and Water Quality Monitoring | |||
at Kai Tak Approach Channel | |||
2012 | Environmental Protection Department | Environmental Protection Department | Tender Ref. 12-00045 |
Tender for the Provision of Services for Control of Water Pollution at Tsuen Wan Beaches | |||
2011 | Drainage Services Department | Drainage Services Department | Flow Survey for Hydraulic Analysis of Yuen Long Bypass Floodway in 2012 |
2011 | Drainage Services Department | Drainage Services Department | Flow Survey for Hydraulic Analysis of Kai Tak Transfer Scheme in 2011 |
2010 | MTR Corporation Limited | Maeda - China State Joint Venture | Express Rail Link |
Contract 823A - Tai Kong Po to Tse Uk Tsuen Tunnels | |||
Sub-Contract for Existing Stream Flow Monitoring and Reporting System | |||
2010 | MTR Corporation Limited | Maeda - China State Joint Venture | Express Rail Link |
Contract 823B - Shek Kong Stabling Sidinigs & Emergency Rescue Sidings | |||
Sub-Contract for Existing Stream Flow Monitoring and Reporting System | |||
2009 | Drainage Services Department | Drainage Services Department, HKSAR | Pilot Monitoring Scheme of Flow Levels in Drainage and Sewerage System |
2009 | Drainage Services Department | US & Associates Consulting Co. Ltd. | DSD Contract No. PM 14/2009 |
Water Quality, Flow Investigation and Manhole Survey at Tuen Mun | |||
2009 | Environmental Protection Department | Environmental Protection Department | Tender Ref: SI 09-033 |
Provision of Service for Control of Water Pollution at Sham Tseng | |||
2009 | Drainage Services Department | Drainage Services Department | Flow Survey for Hydraulic Analysis of Tai Hang Tung Storage Scheme |
2008 | Environmental Protection Department | Environmental Protection Department | Tender Ref. SI 08-079 |
Provision of Service for Sewage Flow Surveys for Kwun Tong Sewerage System | |||
2008 | Drainage Services Department | Info Site Investigation Engineering & Consulting Co. Ltd. | Investigation and Design of Sewer Duplication across |
Flow Survey in Shing Mun River, Siu Lek Yuen Nullah and Fo Tan Nullah | |||
2008 | Drainage Services Department | Drainage Services Department | Agreement No. CE 46/2006 (DS) |
Review of Drainage Master Plans in Yuen Long and North Districts - Feasibility Study | |||
Water Measurement in North District | |||
2008 | Drainage Services Department | Drainage Services Department | Agreement No. CE 46/2006 (DS) |
Review of Drainage Master Plans in Yuen Long and North Districts - Feasibility Study | |||
Water Measurement in Tin Shui Wai and Yuen Long District | |||
2008 | Drainage Services Department | Drainage Services Department | CE 4/2007 (DS) |
Sewage Interception Scheme in Kowloon City - Investigation | |||
Contract No. SP05/2008 - Sewage Flow Monitoring and Water Sampling Survey | |||
2008 | Drainage Services Department | Drainage Services Department | Agreement No. CE 61/2006 (DS) |
Contract No. CM01/2008 – Sewerage Flow Monitoring and Water Sampling | |||
for Upgrading of Central and East Kowloon Sewerage | |||
2007 | Drainage Services Department | Drainage Services Department | River Bed and Flow Discharge Survey at Estuaries of Kam Tin River & Shan Pui River and Tin Shui Wai Western Drainage Channal |
2007 | Drainage Services Department | Drainage Services Department | Hydrologic Measurement at Estuaries of Kam Tin River & Shan Pui River and Tin Shui Wai Western Drainage Channel |
2007 | Drainage Services Department | Drainage Services Department | Agreement No. CE 61/2006 (DS) |
Contract No. CM01/2007 – Sewerage Flow Monitoring and Water Sampling | |||
for Upgrading of Central and East Kowloon Sewerage | |||
2007 | Civil Engineering and Development Department | Civil Engineering and Development Department | Kai Tak Development Engineering Study cum design and construction of Advance Works - Investigation, Design and Construction |
Flow Surveys for Sewerage and Drainage Systems | |||
2007 | Environmental Protection Department | Environmental Protection Department | Agreement No. CE 37/2006(DS) |
Tender Ref. : IP07-034 | |||
Review of West Kowloon and Tsuen Wan Sewerage Master Plans - Feasibility Study | |||
Tender Ref. IP 07-034 - Provision of Service for the Storm water Flow Monitoring Survey | |||
2007 | Civil Engineering and Development Department | Civil Engineering and Development Department | KL/2007/01 |
Kai Tak Development Engineering Study cum design and construction of Advance Works - Investigation, Design and Construction | |||
Flow Surveys for Sewerage and Drainage Systems |
Year | Client | Project Client | Project Description |
---|---|---|---|
2023 | Ming Hing Construction Co., Limited | Pipeline Solutions Limited | Contract No. 5/WSD/21 |
Bracelet Probe RFT and Ultrasonic Testing for DN1200 Twin Pipe at Hung Hom | |||
2022-2023 | Ming Hing Construction Co., Limited | Pipeline Solutions Limited | Contract No. 5/WSD/21 |
Term Contract for Risk-Based Improvement of Water Mains Condition Assessment for 5WSD21 Dongjiang Watermains | |||
2021 | University of Hong Kong | The Jardine Engineering Corporation, Ltd. | Intensive Ultrasonic Test for The Main Campus for the University of Hong Kong |
2007 | Water Supplies Department | Water Supplies Department | Replacement and Rehabilitation of Water Mains Stage 3 |
Mains in New Territories-Investigation, Design and Construction | |||
Condition Survey (Tai Po and Sha Tin) | |||
2007 | Water Supplies Department | Water Supplies Department | Replacement and Rehabilitation of Water Mains Stage 3 |
Mains in New Territories-Investigation, Design and Construction | |||
Condition Survey (Lion Rock Tunnel Road) | |||
2007 | Water Supplies Department | Water Supplies Department | Replacement and Rehabilitation of Water Mains Stage 3 |
Mains in New Territories-Investigation, Design and Construction | |||
Condition Survey (Tuen Mun) | |||
2007 | Water Supplies Department | Water Supplies Department | Agreement No. CE 24/2006 (WS) |
Replacement and Rehabilitation of Water Mains Stage 3 | |||
Mains in New Territories-Investigation, Design and Construction | |||
Condition Survey (Yuen Long) | |||
2007 | Water Supplies Department | Hing & Cheong Co., Limited | 7/WSD/07 |
Replacement and Rehabilitation of Water Mains Stage 2 | |||
Mains in Kowloon-Condition Survey |
Year | Client | Project Client | Project Description |
---|---|---|---|
2023-2024 | Shui On Centre Property Management Limited | Shui On Centre Property Management Limited | Design and Build to reinstate and made good of sea water pump house, vent shaft, pipes, cables and low voltage switch room at Shui On Centre |
2023-2024 | Drainage Services Department | Shun Yuen Construction Company Limited | Contract No. DC/2020/03 Structural Design and Modification of DN450 Rising main and Thrust Block within Hong Kong Golf Club, Deep Water Bay |
2022-2023 | Drainage Services Department | Shun Yuen Construction Company Limited | Contract No. DC/2020/03 Construction and Rehabilitation of Rising Main at Mills and Chung Path, Deep Water Bay – Section I and II |
2021 | The Hong Kong and China Gas Co Ltd | The Hong Kong and China Gas Co Ltd | Pipe Cutting, Sealing and Removing of ExistingGas Main inside Box Culvert at Lei Yue Mun Road JO Tseung Kwan O Road |
2021 | HKT Limited | HKT Limited | Proposed Civil Works Near Telegraph Bay, Salt Water Pumping Station, Cyberport Road (RFQ Ref: W2108007) |
2019 | HKT Limited | HKT Limited | Provision of retrofit works for 29 nos. of deteriorated HKT cable ducts across the decked nullah at Tong Shui Road |
2016 | Guardian Property Management Limited | The Incorporated Owners of The Castle Bay | The Castle Bay, Castle Peak Road, Tuen Mun |
Replacement for Underground Main Water Supply Pipework | |||
青麗灣別墅 更換及維修食水供水主喉管工程 | |||
2014 | I.O. of Jardine Court | Icon City Property Services Ltd. | Proposed Drainage Work - Jardine Court Nos. 24-38 Mount Butler Drive, Jardine's Lookout, HK |
2013 | Chun Wo Construction & Engineering Co., Ltd. | Chun Wo Construction & Engineering Co., Ltd. | Condition Survey at SkyPier P264 |
2010 | Environmental Protection Department | Environmental Protection Department | Tender Ref. SI 10-193 |
Tender for the Provision of Service for Control of Water Pollution | |||
At Tsuen Wan Beaches - Extension of maintenance for UV disinfection systems | |||
2013 | Environmental Protection Department | Environmental Protection Department | Tender Ref. 13-00521 UV Disinfection Trial Scheme on Beach Water Pollution Control at Big Wave Bay Area - Operation and Maintenance of UV Disinfection System |
2009 | Environmental Protection Department, HKSAR | Environmental Protection Department, HKSAR | Tender Ref.: SI 09-125 Provision of Consultancy service for control of water pollution at Lido Beach |
2007 | The Joint Venture Committee - Plantation Road | Kin Ming Design Ltd. | Sewer/Drainage Works at 15 Plantation Road |
- A. CCTV and ME Survey
-
Year Client Project Client Project Description 2024 Drainage Services Department Drainage Services Department Contract No. PR/2024/01 Pipe Cleansing and Condition Surveys On Drains and Sewers with High Water Level / High Flow and Blockage Problem, and Manhole Inspections in Mong Kok Area 2023 Drainage Services Department Drainage Services Department Contract No. MS/2023/06 Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Lai Chi Kok, Cheung Sha Wan, Sham Shui Po, Shek Kip Mei, Tai Kok Tsui, Mong Kok and Yau 2023 Drainage Services Department Drainage Services Department Contract No. MS/2023/01 Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon Bay, Ngau Tau Kok and Kwun Tong 2023 Drainage Services Department Drainage Services Department Contract No. MS/2023/04 Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Ma On Shan, Sha Tin, Tsuen Wan and Kwai Tsing 2023 Drainage Services Department Drainage Services Department Contract No. MS/2023/02 Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon City and Tsim Sha Tsui 2022-2023 Drainage Services Department Binnies Hong Kong Limited Contract No. PR/2021/03, PR/2021/04, PR/2021/05, PR/2021/06, PR/2021/07, PR/2021/08, PR/2021/09, PR/2021/10, PR/2021/11, and PR/2021/12 Engineering Inspection for Underground Stormwater Drains and Sewers in (North District and Yuen Long (North), Yuen Long (South), Tuen Mun and Tsuen Wan (West), Tsuen Wan (East) and Kwai Tsing, Sham Shui Po, Kwun Tong (East), Kwun Tong (West), Kowloon City (East), Yau Tsim Mong (South), and Kowloon City (West) and Yau Tsim Mong (North) 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/18 Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Kowloon West 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/35 Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Kowloon West 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/33 Pipe Cleansing and Condition Surveys on Drains and Sewers in Kolwoon Central 2022 Drainage Services Department Drainage Services Department Contract No. MN/2021/08 Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Tai Po East 2022 Drainage Services Department Drainage Services Department Contract No. MN/2021/09 Pipe Cleaning and Condition Surveys on Drains and Sewers in North District West 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/43 Pipe Cleaning and Condition Surveys on Drains and Sewers, and Manhole Inspection in Tsuen Wan and Kwai Tsing 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/18, PR/20201/33, and PR/2021/35 - Pipe Cleansing and Condition Surveys On Drains and Sewers In Kowloon East, Kowloon Central, and Kowloon West 2021 Drainage Services Department Drainage Services Department Contract No. MN/2021/08, and MN/2021/09 Pipe Cleansing and Condition Surveys on Drains and Sewers and Manhole Inspections in Tai Po East, and North District West 2020 Drainage Services Department Binnies HK Limited Contract No. PM07/2020, PM08/2020, PM 09/2020, PM 10/2020, PM 11/2020, PM 12/2020, and PM 13/2020 - Engineering Inspection for Underground Stormwater Drain and Sewers in Shatin (South), Shatin (North), Eastern Southern and Islands, Central & Western and Wan Chai, Tai Po (Southwest), Tai Po (Northwest), and Tai Po (East) and Sai Kung 2020 Drainage Services Department Drainage Services Department Contract No. MS/2020/21, MS/2020/22, MS/2020/23, MS/2020/24, and MS/2020/25 - Pipe Cleansing and Condition Surveys on Drains and Sewers in Ma On Shan, Tsuen Wan East and Kwai Tsing East, Tsuen Wan West and Kwai Tsing West, Sham Shui Po and Yau Ma Tei, and Mong Kok 2019 Architectural Services Department Architectural Services Department CCTV Survey for Government Properties for which ASD (PSB) is responsible in Tuen Mun and Yuen Long 2018 Architectural Services Department Architectural Services Department Close Circuit Television Surveys for Government Properties for which ArchSD(PSB) is Responsible in Wong Tai Sin & Shatin 2018 Drainage Services Department Black & Veatch Hong Kong Limited Contract No. DPW 03/2018 Condition Survey for Drainage Improvement Works in Mong Kok 2018 Drainage Services Department Black & Veatch Hong Kong Limited Contract No. PM 02/2018 Condition Survey for Decked Nullahs 2018 The Chinese University of Hong Kong The Chinese University of Hong Kong CCTV Inspection for sewer drainage system at Fong Yun Wah Hall, The Chinese University of Hong Kong 2017 Architectural Services Department Architectural Services Department CCTV Survey to Government Properties for which the Architectural Services Department (Property Services Branch) is Responsible in Responsible in Western, Southern & Lantau 2016 Architectural Services Department Architectural Services Department Contract No.: CC-002 Closed Circuit Television Surveys (CCTV) for Government Properties for which ArchSD(PSB) is responsible in Wanchai 2016 Architectural Services Department Architectural Services Department CCTV survey to underground drainage system at Venue 23,10,21,24,25,29,33,11&27 (Kwai Chung) 2016 Architectural Services Department Architectural Services Department CCTV survey to underground drainage system at Venue 1, 2, 3, 12, 13, 31&32 (Tsuen Wan) 2016 The Hong Kong & China Gas Co., Ltd The Hong Kong & China Gas Co., Ltd Man Entry Survey for the Box Culvert in the Territories 2016 The Chinese University of Hong Kong The Chinese University of Hong Kong Provision of CCTV inspection services for part of sewer drainage in Wen Lin Tang, The Chinese University of Hong Kong 2015 TIML MOM Limited TIML MOM Limited TD6/2012 - Agreement for MOM of Tsing Ma Control Area (TMCA) Closed Circuit Television Survey Inspection of At-Grade Road Drains (including Leakage Detection of Buried Water-Carrying Services Affecting Slopes) within Tsing Ma Control Area - 2015 2011 Architectural Services Department Savills Project Consultancy Limited Aged Government Building at Various Location CCTV Survey for Underground Drainage 2011 Architectural Services Department Freevision Limited Consultancy Assignment for Independent Audit Check of Condition Surveys for Building Aged 30 or Above CCTV for Central, Peak, Mid-Level & Wanchai 2008 Kadoorie Estates Ltd. Kadoorie Estates Ltd. CCTV Survey and Remedial Works by competent persons St. George's Building Connaught Road Central, Hong Kong 2008 Drainage Services Department Drainage Services Department CE 4/2007(DS) Sewage Interception Scheme in Kowloon City - Investigation Contract No. SP03/2008 - Manhole and CCTV survey 2007 Hong Kong and China Gas Company Limited Hong Kong and China Gas Company Limited Men-Entry Survey of Box Culvert for existing gas pipe - B. Manhole International Survey
-
Year Client Project Client Project Description 2023 Drainage Services Department Drainage Services Department Drainage Services Department Contract No. MS/2023/06 - Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Lai Chi Kok, Cheung Sha Wan, Sham Shui Po, Shek Kip Mei, Tai Kok Tsui, Mong Kok and Yau Ma Tei 2023 Drainage Services Department Drainage Services Department Contract No. MS/2023/01 - Pipe Cleansing and Condition Surveys on Drains and Sewers, and Manhole Inspections in Kowloon Bay, Ngau Tau Kok and Kwun Tong 2021 Hongkong International Terminals Limited Hongkong International Terminals Limited Manhole Survey and CCTV inspection for the sewage pipe at Terminal 4 2017 Environmental Protection Department Environmental Protection Department Provision of Service for Expedient Connection and Stormwater Manhole Pollution Survey in Mong Kok and Tai Kok Tsui Area 2016 Environmental Protection Department Fuk Shing Construction Co., Ltd. EPD Contract No. EP/SP/90/16 - Condition Survey on Infrastructure to Combat Stormwater Pollution 2016 Hongkong International Terminals Limited Hongkong International Terminals Limited RFQ-2016-41681 Manhole Survey and Utility Survey for New RMGC Cable Ducting Works 2014 Environmental Protection Department Environmental Protection Department Provision of Services for The Identification of ECs in the Catchment Areas of Tsim Sha Tsui East, Kin Wan Street and Hoi Sham Park Box Culverts 2014 Environmental Protection Department Environmental Protection Department Quotation Ref. 14-00232 Provision of Services for the Identification of Expedient Connection in Kwun Tong 2013 Drainage Services Department Drainage Services Department Contract No. 12/LD/2013 Manhole Survey in Tai Po 2013 Drainage Services Department Drainage Services Department Contract No. 09/LD/2013 Manhole Survey in Sha Tin and Sai Kung 2012 Drainage Services Department Drainage Services Department Contract No. 06/LD/2012 Manhole Survey in East Kowloon 2012 Drainage Services Department Drainage Services Department Contract No. 05/LD/2012 Manhole Survey in West Kowloon 2011 Environmental Protection Department Environmental Protection Department Tender Ref. RW 10-166 Tender for the Provision of Service for the Identification of Expedient Connection in Shamshuipo 2011 2009 Environmental Protection Department Environmental Protection Department Tender Ref. RW 08-0243 Provision of Services for Identification of Expedient Connections (2009/2010) Carry out manhole survey for stormwater drainage system at Tuen Mun 2008 Drainage Services Department Drainage Services Department CE 4/2007(DS) Sewage Interception Scheme in Kowloon City - Investigation Contract No. SP03/2008 - Manhole and CCTV survey 2007 Environmental Protection Department Environmental Protection Department CE37/2006(DS) Tender Ref. SI 07-016 Provision of Service for DWFI Inspection Survey 2007 Environmental Protection Department Environmental Protection Department Review of West Kowloon and Tsuen Wan Sewerage Master Plans-Feasibility Study Tender for the Provision of Service for Investigation Surveys for Critical Problematic Areas in West Kowloon and Tsuen Wan 2007 Environmental Protection Department, HKSAR Environmental Protection Department, HKSAR Provision of Service for the Kowloon City District Expedient Connection Survey - C. Utility Survey
-
65Year Client Project Client Project Description 2022-2023 Drainage Services Department Binnies HK Limited Contract No. DPW 04/2022
Excavation of Inspection Pits and Underground Utility Survey for Minor Drainage Improvement Works in Tai Hang and Sheung Wan2022-2023 Drainage Services Department Binnies HK Limited Contract No. DPW 01/2022 Excavation of Inspection Pits and Underground Utility Survey for Minor Drainage Improvement Works in Repulse Bay, Stanley and Sha Tin 2022 Drainage Services Department Binnies HK Limited Contract No. DP 26/2021 Provision of Services of Utility Survey in North District 2021 Drainage Services Department Drainage Services Department Contract No. SD 08/2021 Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works and Other Works - Utility Survey (San Shek Wan to Tong Fuk) 2021 Drainage Services Department Binnies HK Limited Contract No. SM 06/2021 Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Causeway Bay 2021 Drainage Services Department Binnies HK Limited Contract No. SM 05/2021 Terrestrial Laser Scanning, Utility and Tree Surveys for Dry Weather Flow Interceptor at Hung Hom 2020 Drainage Services Department Drainage Services Department Contract No. CM03/2020 Topographical and Utility Survey for North East New Territories Sewerage System Upgrade 2020 Drainage Services Department Drainage Services Department Contract No. DP07/2020 Non-destructive Utilities Survey for Drainage Improvement Works in Sai Kung and North District 2020 Drainage Services Department Drainage Services Department Contract No. DP06/2020 - Non-destructive Utilities Survey for Drainage Improvement Works in Sha Tin 2018 AECOM Asia Co., Limited AECOM Asia Co., Limited Underground Utility Survey at Site Area near East Coast Road and Sky City Interchange 2017 China State Construction Engineering (HK) Ltd. China State Construction Engineering (HK) Ltd. Contract 3801 APM and BHS Tunnels on Existing Airport Island Underground Utility Survey 2016 Gammon Construction Limited Gammon Construction Limited Underground Utility Survey at Black Point Power Station 2016 Meinhardt (Hong Kong) Ltd. Meinhardt (Hong Kong) Ltd. Hong Kong International Airport Contract P271 – Terminal 1 Capacity Enhancement Design Consultancy Services Underground Utility Survey 2015 Hong Kong International Airport AECOM P252 Utility Survey at Airport Road and Sky City Road 2014 Hong Kong International Airport Gammon Construction Limited Hong Kong International Airport Contract P557 – Midfield Phase 2 Development Site Investigation Works 2014 Highways Department CRBC-Kaden Joint Venture Contract No. HY/2013/12 Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works Sub-Contractor Package: UU Detection 2014 CLP Power HK Ltd. Gammon Construction Limited Utility Survey for SI Works for Existing / Prospective Sites of CLP Power's Premises (2014-2016) for CLP Power HK Ltd. 2014 Drainage Services Department Chun Wo Construction & Engineering Co., Ltd Contract No. DC/2012/03 Happy Valley Underground Stormwater Storage Scheme Underground Utilities Detection 2013 Gammon Construction Limited Gammon Construction Limited Happy Valley Racecourse Utility Survey 2013 Penta-Ocean Construction Co., Ltd. MTRC Shatin to Central Link Contract 1102 – Hin Keng Station and Approach Structures Underground Utilities Detection 2012 MTR Corporation Limited Vinci Construction Grands Projets MTRC Hin Keng to Diamond Hill Tunnels (SCL 1103) Underground Utility Survey 2012 Highway Department Dragages-China Harbour-VSL Joint Venture (DCVJV) Contract No. HY/2011/09 Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road Section Between HKSAR Boundary and Scenic Hill Underground Utility Survey 2011 MTR Corporation Limited Chun Wo - Hip Hing Joint Venture MTRC - Kwun Tong Line Extension Contract 1002 Whampoa Station and Overrun Tunnel Non-destructive Utilities Survey 2010 Water Supplies Department AECOM Agreement No. CE 58/2008 (WS) Integration of Ma On Shan and Pak Kong Fresh Water Supply Systems Investigation, Design and Construction Utility Survey in Sai Kung and Ma On Shan Areas 2010 Civil Engineering & Development Department Chun Wo - Leader Joint Venture Contract No. HK/2009/01 Wan Chai Development Phase II Central - Wan Chai Bypass at HKC and Exhibition Centre Detection of Existing Utilities 2009 Drainage Services Department Metcalf & Eddy Ltd. Agreement No. CE 43/2007 (DS) Upgrading of San Wai Sewage Treatment Works -Investigation, Design and Construction Utility Survey for San Wai Sewage Treatment Works Area 2009 Hong Kong Housing Authority Dixie Engineering Co. Ltd. Contract No. 20090061 Underground utilities investigation term contract (2009-2011) 2009 Water Supplies Department Water Supplies Department, HKSAR Agreement No. CE10/2008(WS) Replacement and Rehabilitation of Water Mains Stage 4 Mains in New Territories Utilities Survey in Tuen Mun, Yuen Long and Kam Tin 2009 Water Supplies Department Water Supplies Department Agreement No. CE10/2008/(WS) Replacement and Rehabilitation of Water Mains Stage 4 Mains in New Territories Utilities Survey in Tsing Yi and Kwai Chung 2009 Water Supplies Department Water Supplies Department Agreement No. CE10/2008/(WS) Replacement and Rehabilitation of Water Mains Stage 4 Mains in New Territories Utilities Survey in Tsuen Wan, Siu Lam, Sham Tseng and Ma Wan 2008 MTR Corporation Limited US & Associates Consultants Co., Ltd. Utility survey at MTRC Hung Hom Station 2008 Water Supplies Department Noble Crown Development Ltd. Contract No. 16/WSD/06 Replacement and Rehabilitation of Water Mains Stage 2 Mains in West Kowloon and Kowloon City Underground Utilities Mapping and Survey 2008 Highways Department Highways Department Reconstruction and Improvement of Tuen Mun Road -Design and Construction Supplementary Agreement No. 1 Traffic Improvements to Tuen Mun Road Town Centre Section - Utility Investigation 2006 Water Supplies Department Water Supplies Department CE3/2005(WS) Replacement and Rehabilitation of Water Mains Stage 2 Mains on Hong Kong and Islands Investigation, Design and Construction Utility Survey at Hong Kong East 2006 Water Supplies Department Water Supplies Department CE3/2005(WS) Replacement and Rehabilitation of Water Mains Stage 2 Mains on Hong Kong and Islands Investigation, Design and Construction Utility Survey at Hong Kong Central, Wan Chai & Lantau - D. Water Leakage Detection
-
Year Client Project Client Project Description 2022-2023 Water Supplies Department Water Supplies Department Contract No. 17/WSD/21 - Leak Detection for Water Main in New Territories West 2022-2023 Water Supplies Department Water Supplies Department Contract No. 16/WSD/21 - Leak Detection for Water Main in Hong Kong and Outlying Islands 2022 The Chinese University of Hong Kong The Chinese University of Hong Kong Inspection of Buried Water Carrying Services affecting slopes along Residence Road, The Chinese University of Hong Kong 2019 Hospital Authority Hospital Authority Water Leak Detection at Ruttonjee Hospital 2018 Electrical and Mechanical Service Department Electrical and Mechanical Service Department Water Leakage Survey of Street Fire Hydrant Underground Pipes and Associated accessories at Castle Peak Hospital 2017 Water Supplies Department Water Supplies Department Contract No. 20/WSD/16 - Leak Detection for Water Mains in New Territories West 2016 Water Supplies Department Water Supplies Department Contract No. 5/WSD/16 Leak Detection for Water Mains in Hong Kong and Outlying Island 2014 Water Supplies Department Water Supplies Department Contract No. 12/WSD/14 Leak Detection for Water Mains in Sai Kung 2011 Water Supplies Department Wo Hing Construction Co., Ltd Contract No. 1/WSD/11(K) Water Leak Detection for Maintenance Contract of Water Supplies Department 2010 MTR Corporation Limited MTR Corporation Limited Emergency Water Leakage Detection of MTRC Underground Condensing Mains 2008 Water Supplies Department Wo Hing Construction Co. Ltd. Contract No. 1/WSD/08 (K) Water Leak Detection for Maintenance Contract of Water Supplies Department, HKSAR 2008 Architectural Services Department, HKSAR Architectural Services Department, HKSAR Quotation Ref. No.: O&ML 09-19 Carry out buried water-carrying services leakage testing at Hong Kong Zoological & Botanical Gardens 2008 MTR Corporation Limited Maeda Corporation MTRC-617 Tseung Kwan O South Station Hydrogen Gas Leak Detection for Salt Water Main 2006 Water Supplies Department, HKSAR Wo Hing Construction Co., Ltd Contract No. 1/WSD/06(W) Water Leak Detection for Maintenance Contract of Water Supplies Department, HKSAR - E. Advanced Leakage Detection of Buried Water Carrying Services Affecting Slopes
-
Year Client Project Client Project Description 2022 The Chinese University of Hong Kong The Chinese University of Hong Kong Inspection of Buried Water Carrying Services affecting slopes along Residence Road, The Chinese University of Hong Kong 2016 Savills Property Management Ltd. Tom Leung Consulting Engineers Leakage Investigation Fieldworks for Water Carrying Servcies at No. 5G-5H & 5J-5K Bowen Road, Hong Kong in the Vicinity of Feature No. 11SW-B/CR 618 2013 The Chinese University of Hong Kong The Chinese University of Hong Kong Investigation Works on Buried Water Carrying Services in Vicinity of Various Slope Features within the University's Campus 2009 The Hong Kong Bayanihan Trust US & Associates Consulting Co. Ltd. Consultancy Services Proposal for Discharging of BDDH20/02/HK (BS) at #55, Victoria Road, Hong Kong 2008 The Incorporated Owners of Wah Kwai Estate Maunsell Geotechnical Services Ltd. Leakage detection works for slopes Nos. 11SW-C/C358, 11SW-C/C359, 11SW-C/C360, 11SW-C/F28(2), 11SW-C/FR282, 11SW-C/FR94 & 11SW-C/FR95 at No. 3 Wah Kwai Rd., Wah Kwai Estate, Aberdeen, Hong Kong 2008 Architectural Services Department, HKSAR Architectural Services Department, HKSAR Quotation Contract No.: 33/KWT(W)/2008 Inspection and testing of buried water-carrying services with 2 set reports at Wo Yi Hop Road Sports Ground, Tang Shiu Kin Sports Centre and North Kwai Chung Jockey Club Swimming Pool 2008 Architectural Services Department, HKSAR Architectural Services Department, HKSAR Carry out BWCS works to lot no. HKM-19 Ex-Pathological Institute (Medical Museum), 2 Caine Lane 2003 The Chinese University of Hong Kong Univic Engineering Ltd Investigation & Repair Works on Buried Water Carrying Services at Features Nos. 7NE-C/C65, C66, C127, C132, C150, C156, C166, C179, C232, C266, C270, C276, C281, C307, C396, CR135, F16, F18, F129, FR84 & R7 for the Chinese University of HK 2003 Hong Kong Housing Authority, HKSAR Yick Hing Construction Co Ltd HKHA CONTRACTNO 20010038 TERM CONTRACT FOR SLOPE MAINTENANCE AND IMPROVEMENT WORKS AT NORTHERN REGION(FOLLOW UP UTEC DATA) - F. Pipe Rehabilitation by Trenchless Technology
-
Year Client Project Client Project Description 2024 Drainage Services Department Drainage Services Department Contract No. MS/2024/05 Rehabilitation and Replacement of Sewers at Kin Chuen Street and Wo Tong Tsui Street near Tai Wo Hau Road, Kwai Chung 2024 Drainage Services Department Drainage Services Department Contract No. PR/2023/15
Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 2)
2024 Drainage Services Department Drainage Services Department Contract No. PR/2023/16
Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 3)
2024 Drainage Services Department Drainage Services Department Contract No. PR/2023/17
Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 4)
2024 Drainage Services Department Drainage Services Department Contract No. PR/2023/18
Rehabilitation and Replacement of Sewer and Stormwater Drain in Mainland South (Package 5)
2024 Drainage Services Department Drainage Services Department Contract No. PR/2024/03
Sewer/Stormwater Drain Rehabilitation in Yau Kom Tau
2023-2024 Drainage Services Department Drainage Services Department Contract No. PR/2023/02 Trunk Stormwater Drain Rehabilitation at Wan Wah Street near Wai Wah Street, Wong Tai Sin 2023-2024 Drainage Services Department Drainage Services Department Contract No. HKI/2023/03 Rehabilitation and Replacement of Sewer and Stormwater Drain at Hong Kong Island (Eastern) (Package 2) 2023-2024 Drainage Services Department Drainage Services Department Contract No. HKI/2022/09 Rehabilitation and Replacement of Sewer and Stormwater Drain at Hong Kong Island (Eastern) (Package 1) 2023-2024 Drainage Services Department Drainage Services Department Contract No. PR/2022/21 Invitation for Quotation Sewer Rehabilitation near Chai Wan Kok Street, Sha Tsui Road, Tai Pa Street in Tsuen Wan and Wo Kwai Lane in Kwai Chung 2023-2024 Drainage Services Department Drainage Services Department Contract No. PR/2022/24 Trunk Sewer / Stormwater Drain Rehabilitation in Sham Shui Po 2023-2024 Drainage Services Department Drainage Services Department Contract No. MN/2022/09 Pipe Rehabilitation in Yuen Long 2022-2023 Drainage Services Department Drainage Services Department Contract No. MN/2022/05 Pipe Rehabilitation in Tuen Mun 2022 Drainage Services Department Drainage Services Department Contract No. HKI/2021/08 Rehabilitation of Sewer and Stormwater Drain in Central 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/31 Sewer/Stormwater Drain Rehabilitation in Tseung Kwan O 2022 Drainage Services Department Drainage Services Department Contract No. PR/2021/02 Sewer/Stormwater Drain Rehabilitation near Lok Shan Road 2021 Drainage Services Department Drainage Services Department Contract No. MS/2020/19 Sewer/Stormwater Drain Rehabilitation in Sheung Kwai Chung 2019 Drainage Services Department Drainage Services Department Contract No. PM08/2018 Sewer Rehabilitation at Salisbury Road adjacent to Nathan Road and Middle Road, Tsim Sha Tsui 2018 New World Construction Company Limited New World Construction Company Limited High Pressure Water Jetting & Relining of 225 mm diameter pipe at Sai Yuen Lane, Sai Ying Pun 2018 Leighton-Gammon Joint Venture (810A) Leighton-Gammon Joint Venture (811A) Lining at 810A West Kowloon Terminus Station North 2017 New World Construction Co. Ltd. New World Construction Co. Ltd. Lining Work of Existing 1200mm dia. Sewer Pipe at Salisbury Road (for KS61 Project) 2017 I.O. of Fu Keung Court Shui On Properties Management Limited Underground Drainage System Repair Work at Blocks B & C of Fu Keung Court 2016 New World Construction Co. Ltd. Kaden Construction Limited 12106 New World Centre Remodeling Nominated Subcontract (Package Code no. 4040) Sea Deck A&A Works Subcontract No. 1309/6010 - Pipeline Rehabilitation 2016 The Incorporated Owners of Green Villa The Incorporated Owners of Green Villa Lining works at Green Villa 2013 Architectural Services Department Architectural Services Department Quotation No.: P&ML-13-107 Internal Lining for Underground Drainage Repair at Fairmont Gardens 2011 Penta-Ocean Construction Co., Ltd. Penta-Ocean Construction Co., Ltd. Relining Works to Drainage Pipe at Choi Ming Street and King Ling Road, Tsuen Kwan O 2011 Hongkong Land Ltd. Davis Langdon & Seah Hong Kong Ltd. Hongkong Land Sewerage Review 2008 Tender for Pipeline Rehabilitation Works (Phase II) 2010 The Hong Kong and China Gas Co. Ltd. The Hong Kong and China Gas Co. Ltd. Quotation Ref. No.: ND/NP/MIS/K/Q005/10 Pipe Cutting, Sealing and Removing of Existing 300mm Gas Main (with sleeve or without sleeve) inside Box Culvert at Tokin Street J/O Fuk Wing Street I/C with DSD Project PWP Item 4138CD - Decking of Tonkin Street 2009 Hongkong Land Ltd. Hongkong Land Ltd. Hongkong Land Seawater Review 2008 Pipeline Rehabilitation Works Ice House Street, Des Voeux Road 2008 The Plantation Road JV committee Kam Ming Design Limited New Sewer/Drainage works at 15-27 Plantation Road, The Peak 2008 Kadoorie Estates Ltd. Kadoorie Estates Ltd. CCTV Survey and Remedial Works by competent persons St. George's Building Connaught Road Central, Hong Kong 2008 Civil Engineering and Development Department, HKSAR Leighton-China State-Van Oord Joint Venture H2189-Central Reclamation Joint Repair at the Central Reclamation III Site for two DN900mm Sea Water Cooling Mains by AMEX-10 Seal 2006 The Hongkong and Shanghai Banking Corporation (HSBC) Johnson Controls Hong Kong Ltd. HSBC Main Building - BRW16-05 Seawater Main Pipe Inspection and Repair at HMB - G. GPR(Ground Penetrating Rader) Survey
-
Year Client Project Client Project Description 2023 World Genius Corporation Limited World Genius Corporation Limited Void Detection (GPR Survey) and Grouting Work at Sun Hung Kai Centre, Tonrochy Road, Wan Chai 2021 The Lab (Asia) Ltd The Lab (Asia) Ltd Void Detection by GPR Survey at Hong Kong International Airport Taxiway 2020 Wo Hing Construction Co., Ltd Wo Hing Construction Co., Ltd Locating the alignment of 2xDN1000 and 1xDN500 Coolling Main at Kai Tak Area by Ground Penetrating Radar (GPR) Survey 2018 Chun Wo Construction & Engineering Co Ltd Chun Wo Construction & Engineering Co Ltd Tolo Highway Highway, southbound near Shatin Racecourse Road Ground Penetrating Radar (GPR) Survey 2018 New City Construction Co., Ltd. New City Construction Co., Ltd. Utility and GPR Survey at Tsun Yip Street, Kwun Tong 2016 MTR Corporation Limited Chun Wo Construction & Engineering Co., Ltd. Void Detection of the soil underneath the tracks at Tung Chung Line by Ground Penetrating Radar (GPR) 2014 Great East Asia Surveyors & Consultants Co. Ltd. Great East Asia Surveyors & Consultants Co. Ltd. Four survey locations at Shell Tsing Yi Installation, Sai Tso Wan Road, Tsing Yi, N.T. Ground Penetrating Radar (GPR) Survey 2014 Leader - Sunnic Joint Venture Leader - Sunnic Joint Venture Pavement Area near Klnwcity Community Hall Choi Hung Road, Wong Tai Sin GPR Survey 2013 Samsung - Hsin Chong Joint Venture Samsung - Hsin Chong Joint Venture SCL 1109: Structural Diagnostic on Nullah Rock Wall 2010 Drainage Services Department, HKSAR China Road and Bridge Corporation Contract No.: DC/2009/07 North District and Tolo Harbour Regional Sewerage – Upgrading of Trunk Sewers at Ma Liu Shui, Tai Po and North District 2009 Harbour City Estates Limited Harbour City Estates Limited Ocean Terminal, Tsim Sha Tsui, Kowloon 2009 Drainage Services Department, HKSAR Penta-Ocean Construction Co. Ltd. Contract No. DC/2002/02 Wan Chai East and North Point Sewerage Remaining Works GPR Survey at Tin Hau Temple Road 2009 Hong Kong Customs and Excise Dept. Hong Kong Customs and Excise Dept. GPR survey for void detection at Stonecutters Island Public Cargo Working Area 2009 CM Wong & Associates Ltd. CM Wong & Associates Ltd. Structural survey for the Stone Houses at Hau Wong Temple New Village and Old House Wong UK Village, Shatin 2009 Penta Ocean Construction Co., Ltd Black & Veatch Hong Kong Limited Emergency Works for Void Detection by Ground Penetrating Radar (GPR) Survey At Tai Hang Road, Hong Kong 2008 ExxonMobil Hong Kong Ltd. ExxonMobil Hong Kong Ltd. WS UG Fireline GPR (Ground Penetrating Radar) at Tsing Ti West Site, Tsing Keung No. 19 2008 Sanfield Building Contractors Ltd. Sanfield Building Contractors Ltd. Void Detection by Ground Penetrating Radar Survey (GPR) at Hoi Fai Road, Kowloon 2007 Highways Department, HKSAR Hip Hing Construction Co., Ltd GPR Survey at Ma Tin Road, Yuen Long - H. Flow Survey
-
Year Client Project Client Project Description 2021 Hing & Cheong Co. Ltd. Hing & Cheong Co. Ltd. Flow Survey for Manholes at Contract DC/2020/08 2018 WSP Group WSP Group Water Flow Rate Measurement at Diamond Hill CDA Site 2016 Drainage Services Department Drainage Services Department Contract No. HKI 01/2016 Installation of Flow Monitoring System of Hong Kong West Drainage Tunnel, Lai Chi Kok Drainage Tunnel and Tsuen Wan Drainage Tunnel 2016 Drainage Services Department Drainage Services Department Contract No. 05/LD/2016 Flow Survey in Tsuen Wan Drainage Tunnel 2016 Drainage Services Department Drainage Services Department Contract No. 06/LD/2016 Flow Survey of Hong Kong West Drainage Tunnel 2015 Drainage Services Department Drainage Services Department Contract No. 03/LD/2015 Installation of New Gauging Stations at Yuen Long 2015 Drainage Services Department Drainage Services Department Contract No. 04/LD/2015 Flow Survey of Hong Kong West Drainage Tunnel 2013 Drainage Services Department Drainage Services Department Contract No. 14/LD/2013 Flow Survey in Hong Kong West Drainage Tunnel 2013 Drainage Services Department Drainage Services Department Contract No. PM 2/2013 Flow Monitoring, CCTV and Manhole Surveys for Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung 2013 Drainage Services Department Drainage Services Department Contract No. 06/LD/2013 River Flood Risk Study - Stage 1 River Monitoring and Flood Warning System at Chuen Lung, Tsuen Wan and Ta Shek Wu, Pat Heung 2012 Drainage Services Department Drainage Services Department Contract No. SPW 04/2013 CCTV, Manhole, Utility and Flow Surveys, and Water Sampling and Testing for Yuen Long Town Nullah (Town Centre Section) - Stage 1 Improvement Works 2012 Drainage Services Department Drainage Services Department Contract No. 11/LD/2012 Flow Survey in Hong Kong West Drainage Tunnel 2012 Drainage Services Department Drainage Services Department Quotation Ref: MS/2012/04 Extended Monitoring Scheme of Flow Levels in Drainage and Sewerage Systems 2012 Civil Engineering and Development Department Civil Engineering and Development Department Contract No. KLN/2012/09 Pollution Loading Inventory Survey and Water Quality Monitoring at Kai Tak Approach Channel 2012 Environmental Protection Department Environmental Protection Department Tender Ref. 12-00045 Tender for the Provision of Services for Control of Water Pollution at Tsuen Wan Beaches 2011 Drainage Services Department Drainage Services Department Flow Survey for Hydraulic Analysis of Yuen Long Bypass Floodway in 2012 2011 Drainage Services Department Drainage Services Department Flow Survey for Hydraulic Analysis of Kai Tak Transfer Scheme in 2011 2010 MTR Corporation Limited Maeda - China State Joint Venture Express Rail Link Contract 823A - Tai Kong Po to Tse Uk Tsuen Tunnels Sub-Contract for Existing Stream Flow Monitoring and Reporting System 2010 MTR Corporation Limited Maeda - China State Joint Venture Express Rail Link Contract 823B - Shek Kong Stabling Sidinigs & Emergency Rescue Sidings Sub-Contract for Existing Stream Flow Monitoring and Reporting System 2009 Drainage Services Department Drainage Services Department, HKSAR Pilot Monitoring Scheme of Flow Levels in Drainage and Sewerage System 2009 Drainage Services Department US & Associates Consulting Co. Ltd. DSD Contract No. PM 14/2009 Water Quality, Flow Investigation and Manhole Survey at Tuen Mun 2009 Environmental Protection Department Environmental Protection Department Tender Ref: SI 09-033 Provision of Service for Control of Water Pollution at Sham Tseng 2009 Drainage Services Department Drainage Services Department Flow Survey for Hydraulic Analysis of Tai Hang Tung Storage Scheme 2008 Environmental Protection Department Environmental Protection Department Tender Ref. SI 08-079 Provision of Service for Sewage Flow Surveys for Kwun Tong Sewerage System 2008 Drainage Services Department Info Site Investigation Engineering & Consulting Co. Ltd. Investigation and Design of Sewer Duplication across Flow Survey in Shing Mun River, Siu Lek Yuen Nullah and Fo Tan Nullah 2008 Drainage Services Department Drainage Services Department Agreement No. CE 46/2006 (DS) Review of Drainage Master Plans in Yuen Long and North Districts - Feasibility Study Water Measurement in North District 2008 Drainage Services Department Drainage Services Department Agreement No. CE 46/2006 (DS) Review of Drainage Master Plans in Yuen Long and North Districts - Feasibility Study Water Measurement in Tin Shui Wai and Yuen Long District 2008 Drainage Services Department Drainage Services Department CE 4/2007 (DS) Sewage Interception Scheme in Kowloon City - Investigation Contract No. SP05/2008 - Sewage Flow Monitoring and Water Sampling Survey 2008 Drainage Services Department Drainage Services Department Agreement No. CE 61/2006 (DS) Contract No. CM01/2008 – Sewerage Flow Monitoring and Water Sampling for Upgrading of Central and East Kowloon Sewerage 2007 Drainage Services Department Drainage Services Department River Bed and Flow Discharge Survey at Estuaries of Kam Tin River & Shan Pui River and Tin Shui Wai Western Drainage Channal 2007 Drainage Services Department Drainage Services Department Hydrologic Measurement at Estuaries of Kam Tin River & Shan Pui River and Tin Shui Wai Western Drainage Channel 2007 Drainage Services Department Drainage Services Department Agreement No. CE 61/2006 (DS) Contract No. CM01/2007 – Sewerage Flow Monitoring and Water Sampling for Upgrading of Central and East Kowloon Sewerage 2007 Civil Engineering and Development Department Civil Engineering and Development Department Kai Tak Development Engineering Study cum design and construction of Advance Works - Investigation, Design and Construction Flow Surveys for Sewerage and Drainage Systems 2007 Environmental Protection Department Environmental Protection Department Agreement No. CE 37/2006(DS) Tender Ref. : IP07-034 Review of West Kowloon and Tsuen Wan Sewerage Master Plans - Feasibility Study Tender Ref. IP 07-034 - Provision of Service for the Storm water Flow Monitoring Survey 2007 Civil Engineering and Development Department Civil Engineering and Development Department KL/2007/01 Kai Tak Development Engineering Study cum design and construction of Advance Works - Investigation, Design and Construction Flow Surveys for Sewerage and Drainage Systems - I. Pipe Condition Surveys by other non-destructive methods
-
Year Client Project Client Project Description 2023 Ming Hing Construction Co., Limited Pipeline Solutions Limited Contract No. 5/WSD/21 Bracelet Probe RFT and Ultrasonic Testing for DN1200 Twin Pipe at Hung Hom 2022-2023 Ming Hing Construction Co., Limited Pipeline Solutions Limited Contract No. 5/WSD/21 Term Contract for Risk-Based Improvement of Water Mains Condition Assessment for 5WSD21 Dongjiang Watermains 2021 University of Hong Kong The Jardine Engineering Corporation, Ltd. Intensive Ultrasonic Test for The Main Campus for the University of Hong Kong 2007 Water Supplies Department Water Supplies Department Replacement and Rehabilitation of Water Mains Stage 3 Mains in New Territories-Investigation, Design and Construction Condition Survey (Tai Po and Sha Tin) 2007 Water Supplies Department Water Supplies Department Replacement and Rehabilitation of Water Mains Stage 3 Mains in New Territories-Investigation, Design and Construction Condition Survey (Lion Rock Tunnel Road) 2007 Water Supplies Department Water Supplies Department Replacement and Rehabilitation of Water Mains Stage 3 Mains in New Territories-Investigation, Design and Construction Condition Survey (Tuen Mun) 2007 Water Supplies Department Water Supplies Department Agreement No. CE 24/2006 (WS) Replacement and Rehabilitation of Water Mains Stage 3 Mains in New Territories-Investigation, Design and Construction Condition Survey (Yuen Long) 2007 Water Supplies Department Hing & Cheong Co., Limited 7/WSD/07 Replacement and Rehabilitation of Water Mains Stage 2 Mains in Kowloon-Condition Survey - J. Works
-
Year Client Project Client Project Description 2023-2024 Shui On Centre Property Management Limited Shui On Centre Property Management Limited Design and Build to reinstate and made good of sea water pump house, vent shaft, pipes, cables and low voltage switch room at Shui On Centre 2023-2024 Drainage Services Department Shun Yuen Construction Company Limited Contract No. DC/2020/03 Structural Design and Modification of DN450 Rising main and Thrust Block within Hong Kong Golf Club, Deep Water Bay
2022-2023 Drainage Services Department Shun Yuen Construction Company Limited Contract No. DC/2020/03 Construction and Rehabilitation of Rising Main at Mills and Chung Path, Deep Water Bay – Section I and II 2021 The Hong Kong and China Gas Co Ltd The Hong Kong and China Gas Co Ltd Pipe Cutting, Sealing and Removing of ExistingGas Main inside Box Culvert at Lei Yue Mun Road JO Tseung Kwan O Road 2021 HKT Limited HKT Limited Proposed Civil Works Near Telegraph Bay, Salt Water Pumping Station, Cyberport Road (RFQ Ref: W2108007) 2019 HKT Limited HKT Limited Provision of retrofit works for 29 nos. of deteriorated HKT cable ducts across the decked nullah at Tong Shui Road 2016 Guardian Property Management Limited The Incorporated Owners of The Castle Bay The Castle Bay, Castle Peak Road, Tuen Mun Replacement for Underground Main Water Supply Pipework 青麗灣別墅 更換及維修食水供水主喉管工程 2014 I.O. of Jardine Court Icon City Property Services Ltd. Proposed Drainage Work - Jardine Court Nos. 24-38 Mount Butler Drive, Jardine's Lookout, HK 2013 Chun Wo Construction & Engineering Co., Ltd. Chun Wo Construction & Engineering Co., Ltd. Condition Survey at SkyPier P264 2010 Environmental Protection Department Environmental Protection Department Tender Ref. SI 10-193 Tender for the Provision of Service for Control of Water Pollution At Tsuen Wan Beaches - Extension of maintenance for UV disinfection systems 2013 Environmental Protection Department Environmental Protection Department Tender Ref. 13-00521 UV Disinfection Trial Scheme on Beach Water Pollution Control at Big Wave Bay Area - Operation and Maintenance of UV Disinfection System 2009 Environmental Protection Department, HKSAR Environmental Protection Department, HKSAR Tender Ref.: SI 09-125 Provision of Consultancy service for control of water pollution at Lido Beach 2007 The Joint Venture Committee - Plantation Road Kin Ming Design Ltd. Sewer/Drainage Works at 15 Plantation Road